Hydropower Jobs in Nepal | MKHEP Vacancy Announcement
Company Name
Suchanaa
The Middle Kaligandaki Hydroelectric Project (MKHEP) is a run-of-river hydroelectric project with an installed capacity of 66.30 MW, located in the Myagdi District of Gandaki Province, Nepal. This strategic project is being executed by Rasuwa-Multi J/V, contributing significantly to Nepal’s growing hydropower sector.
Hydropower Jobs in Nepal
Open Positions
1. Project Manager – 1 Position
- Bachelor’s Degree in Civil Engineering (Master’s preferred)
- Minimum 15 years of professional experience in hydropower
- Must have handled at least one 100 MW hydroelectric project
- Proven experience in underground powerhouse construction
2. QC Engineer – 1 Position
- Bachelor’s Degree in Civil Engineering or related field
- Minimum 10 years of experience in quality control for hydroelectric or large-scale civil/engineering projects
3. Tunnel Engineer – 2 Positions
- Bachelor’s Degree in Civil Engineering or related field
- Minimum 5 years of experience in underground excavation
4. Senior Surveyor – 1 Position
- Minimum 15 years of experience in surveying for hydroelectric projects
- Proficiency in total stations, GPS, and survey software
5. Assistant Surveyor – 1 Position
- Diploma or equivalent in Surveying, Geomatics, Civil Engineering, or related field
- Minimum 1 year of experience in surveying activities
6. Tunnel Supervisor – 1 Position
- Diploma or Degree in Civil/Geotechnical Engineering or related field
- Minimum 15 years of experience supervising tunnel construction (preferably in hydroelectric projects)
Remuneration: Negotiable as per experience and qualifications
Application Requirements
Interested candidates are requested to submit the following documents:
- Updated CV
- Copies of academic and professional certificates
- Citizenship certificate (Nepali or Indian)
How to Apply
- Email: midcompany@midc.com.np
- Phone: +977-014002676
- Office Address: Panipokhari, Kathmandu
midcompany@midc.com.np |