GAWAR Construction Limited New Vacancy 2024 | Mumbai Metro’s Line-12 (Orange Line) connecting Kalyan – Dombivali – Amandoot (Taloja)

हमसे जुरने के लिए ग्रुप को जॉइन करे
Construction Jobs पाने के लिए WhatsApp मे जुड़े Join Now
Construction Jobs पाने के लिए Telegram मे जुड़े Join Now
Dubai Jobs के लिए ग्रुप मे जुड़े Join Now

GAWAR Construction Limited New Vacancy 2024 | Mumbai Metro’s Line-12 (Orange Line) connecting Kalyan – Dombivali – Amandoot (Taloja)

Company Name

Project: Undertaking Mumbai Metro’s Line-12 (Orange Line) connecting Kalyan – Dombivali – Amandoot (Taloja) as per the directives of the Mumbai Metropolitan Region Development Authority (MMRDA).

GAWAR Construction Limited New Vacancy 2024

1. Project Head

  • Qualification: Graduate in Civil Engg.
  • Experience: Minimum total experience of 25 years out of which a minimum of 5 years as Project Head of Metro works

2. Deputy Project Head

  • Qualification: Graduate in Civil Engg.
  • Experience: Minimum total experience of 20 years out of which a minimum of 5 years as Deputy Project Head of Metro works

3. Project Manager

  • Qualification: Graduate in Civil Engg.
  • Experience: Minimum total experience of 20 years out of which a minimum of 5 years as Project Manager/In-charge of Metro works

4. Deputy Project Manager

  • Qualification: Graduate in Civil/ Mechanical Engg.
  • Experience: Minimum total experience of 15 years out of which a minimum of 5 years in Metro works

5. Deputy Project Manager (Launching)

  • Qualification: Graduate in Civil/ Mechanical Engg.
  • Experience: Minimum 15 years in the field of launching/Crane working out of which a minimum of 5 years in Metro launching works

6. Interface Manager

  • Qualification: Graduate in Civil/ Mechanical Engg.
  • Experience: Minimum experience of 15 years out of which a minimum of 5 years in Metro works

7. Planning Head

  • Qualification: Graduate in Civil Engg.
  • Experience: Minimum experience of 25 years out of which a minimum of 5 years as Planning Head of Metro works

8. Planning Manager

  • Qualification: Graduate in Civil Engg. With knowledge in MS project/Primavera software
  • Experience: Minimum experience of 15 years out of which a minimum of 5 years as Planning Manager of Metro works

9. Planning Engineer

  • Qualification: Graduate in Civil Engg.
  • Experience: Minimum experience of 10 years out of which a minimum of 5 years in planning of projects

10. Design Head

  • Qualification: Graduate in Civil Engg.
  • Experience: Minimum experience of 25 years out of which a minimum of 5 years as Design Head of Metro works

11. Design Engineer/ Structural Engineer

  • Qualification: Graduate in Civil Engg.
  • Experience: Minimum experience of 10 years out of which a minimum of 5 years in Metro works

12. Sr. Geotechnical Engineer

  • Qualification: Graduate in Civil Engg.
  • Experience: Minimum experience of 15 years out of which a minimum of 5 years in Geotechnical Engineering. experience in Metro works

How to Apply:

Interested candidates can email their resume at: HR@gawar.in

KMV Projects Ltd Latest Vacancy 2024Click Here
Wabag Multiple Positions Hiring 2024Click Here
Dineshchandra R. Agrawal Infracon Pvt Ltd Urgent Hiring 2024Click Here
Bureau Veritas India Pvt Ltd Urgent Hiring 2024Click Here
✅ Follow WhatsApp ChannelClick Here
Join Afcons Infrastructure Facebook GroupClick Here
Join NCC Ltd Facebook GroupClick Here
Join Construction Placement GroupClick Here
Sobha Construction Ltd Group Click Here
Dilip Buildcon Ltd., Bhopal GroupClick Here
Join WhatsApp Group– 1Click Here
Join WhatsApp Group– 2Click Here
Join WhatsApp Group– 3Click Here
Join Telegram GroupClick Here
GAWAR Construction Limited New Vacancy 2024
GAWAR Construction Limited New Vacancy 2024

5 thoughts on “GAWAR Construction Limited New Vacancy 2024 | Mumbai Metro’s Line-12 (Orange Line) connecting Kalyan – Dombivali – Amandoot (Taloja)”

Leave a Comment