Patel Engineering Signs MoU for 144 MW Gongri Hydropower Project in Arunachal Pradesh | ₹1,700 Cr Renewable Energy Push

हमसे जुरने के लिए ग्रुप को जॉइन करे
WhatsApp Group Join Now
Telegram Group Join Now

Patel Engineering Signs MoU for 144 MW Gongri Hydropower Project in Arunachal Pradesh | ₹1,700 Cr Renewable Energy Push

Patel Engineering Limited has taken a major step toward strengthening India’s clean energy landscape by signing an MoU with the Government of Arunachal Pradesh for the development of the 144 MW Gongri Hydropower Project.

This landmark initiative aligns with Arunachal Pradesh’s vision of becoming a hydropower hub and marks one of the first projects revived under the state’s new Hydropower Revival Policy.

Project: Gongri Hydropower Project
Capacity: 144 MW
Location: West Kameng District, Arunachal Pradesh
Estimated Project Cost: ~₹1,700 Crore
Development Model: BOOT (Build–Own–Operate–Transfer)
Concession Period: 40 Years
Execution Timeline: ~4 Years

Why This Project Matters:

This project goes beyond power generation. It is expected to:
• Strengthen renewable energy capacity in Northeast India
• Create significant local employment opportunities
• Boost regional infrastructure and economic growth
• Support sustainable and environmentally responsible development

With this MoU, Patel Engineering reinforces its position as a key player in India’s hydropower and infrastructure development journey, contributing to a greener and more resilient energy future.

Leave a Comment