Vadhavan Port Connectivity Project Update 2026 | EPC Bidding Results & Top Infra Companies List
The Vadhavan Port Connectivity Project is a major infrastructure development in Maharashtra aimed at improving connectivity between Vadhavan Port and NH-48 (Tawa Village).
This project involves the construction of a 4-lane expressway (expandable to 8 lanes) with a total length of 32.180 km, to be executed under EPC mode.
The financial bids for this prestigious project have been opened, with strong participation from leading infrastructure companies across India.
Project Details
- Location: Maharashtra
- Length: 32.180 Km
- Type: 4-Lane (Expandable to 8-Lane) Expressway
- Mode: EPC (Engineering, Procurement & Construction)
Financial Bid Summary
1. J. Kumar Infraprojects Ltd. – Shinde Developers Pvt. Ltd. (JV)
- Bid Price: ₹2360,00,00,000
- Rank: L-1
2. Patel Infrastructure Ltd. – SMC Infrastructures Pvt. Ltd. – GPT Infraprojects Ltd. (JV)
- Bid Price: ₹2382,60,00,000
- Rank: L-2
3. PNC Infratech Ltd. – Patel Engineering Ltd. (JV)
- Bid Price: ₹2394,00,00,000
- Rank: L-3
4. Gawar Construction Limited
- Bid Price: ₹2448,99,00,000
- Rank: L-4
5. Dilip Buildcon Limited
- Bid Price: ₹2610,00,00,000
- Rank: L-5
6. GR Infraprojects Limited
- Bid Price: ₹2627,17,00,000
- Rank: L-6
7. Afcons Infrastructure Limited
- Bid Price: ₹2801,86,00,000
- Rank: L-7
8. ABCI Infrastructures Pvt. Ltd. – Konkan Railway Corporation Limited (JV)
- Bid Price: ₹2889,00,00,000
- Rank: L-8
9. Dineshchandra R Agrawal Infracon Pvt. Ltd.
- Bid Price: ₹3389,00,00,000
- Rank: L-9
10. Larsen & Toubro Limited
- Bid Price: ₹3472,30,00,000
- Rank: L-10
11. Cemindia Projects Limited – IRCON International Limited (JV)
- Bid Price: ₹3487,00,00,000
- Rank: L-11
Key Insights
- Strong competition with a narrow gap between top bidders
- Participation from top EPC and joint venture companies
- Reflects rapid growth in India’s infrastructure sector
Why This Project Matters
- Enhances connectivity to Vadhavan Port
- Improves logistics and transportation efficiency
- Boosts regional economic development
- Supports large-scale infrastructure expansion in Maharashtra
QNA (Frequently Asked Questions)
Q1. What is the Vadhavan Port Connectivity Project?
It is a 4-lane (expandable to 8-lane) expressway project connecting Vadhavan Port to NH-48
Q2. What is the total project length?
32.180 km
Q3. Who is the lowest bidder (L-1)?
J. Kumar Infraprojects Ltd. – Shinde Developers Pvt. Ltd. (JV)
Q4. What type of project is this?
EPC (Engineering, Procurement & Construction) project
Q5. Why is this project important?
It improves port connectivity, logistics, and regional economic growth


